Behind-the-Scenes Tour: Greater Cleveland Regional Transit Authority Rail Shop
• Meet at Tower City Rapid station. Tour will begin at Tower City Green/Blue Line Platform Track 10E directly into the Rail Shop (Transportation time 15-20 minutes to/from TC)
• Tour/Presentation of Rail Shop will be conducted by Timothy O'Donnell, Manager of Rail Equipment
• The Shop tour will consist of a walk 'n' talk through each Shop section. Inspection, Defect Repair, Motors, Truck Shop, Body Shop, HRV Midlife. There will also be a (very) short description of the Heavy and Light Rail cars.
• Return to Tower City
FREE. Earn 1 CPD hour. Registration limited to 50 attendees.
Official Website: http://www.cesnet.org/evtView.asp?evtID=180
Added by CES3100 on May 28, 2009